Chennai Metropolitan Water Supply and Sewerage Board
Works Completed | 34 local bodies |
Works under Progress | 7 local bodies |
Work to be taken up | 1 local body |
Total | 42 local bodies |
Under Ground Sewerage Schemes:
Works Completed | 17 local bodies |
Works Under Progress | 10 local bodies |
Work to be taken up | 15 local bodies & Left out areas of Madhavaram |
Total | 42 local bodies & Left out areas of Madhavaram |
Preparation of DPR for Strengthening / Replacement of Existing Water Transmission mains and Formulating a Ring main System consisting of Existing / New Transmission mains connecting existing water Treatment plants and Water Distribution Stations in Chennai City as a consultant assignment.
Project Design Consultancy for `Preparation of Detailed Project Report for Improvement of Existing Sewerage System in Core Area of Greater Chennai City (174 Sq. Km) and providing SCADA for the entire Greater Chennai City (426 Sq.Km)" for CMWSSB.
Preparation of Assets and Utility Maps using Geo-spatial Techniques (GIS) for Chennai Metropolitan Water Supply and Sewerage Board (PDC I) under Asian Development Bank funded Tamil Nadu Urban flagship Investment Program (TNUFIP).